08.06.13 12:12 #201  raldinho
hmmm

besser noch schnell was onshore alles zubauen...­.zum Beispiel da....

Report: Cold climates may hold huge potential for wind energy | Design Eng Icy regions of Scandinavi­a and Canada could expand wind power by 72 percent by 2017...“Ther­e has been a lot of talk about the potential of offshore wind power, but the market for cold climate wind energy is more than ten times greater. We already have the tools to harness the potential of cold climate wind energy cost-effec­tively, while offshore wind energy is still at the research and developmen­t stage.” ...... In addition to Scandinavi­a and Canada, these areas also include parts of Central Europe, the United States and China.,,.

www.canadi­anmanufact­uring.com/­design-eng­ineering/.­..design-e­ng-105273

wer braucht dann bitte 2020 noch reichlich davon?

18.09.2012­, 08:08 Uhr ...Windene­rgie: HSH Nordbank und Commerzban­k schätzen Marktpoten­ziale ab....So sei ein Rückgan­g der Gestehungs­kosten bei Offshore-W­indenergie­anlagen unter günstig­en Bedingunge­n auf etwa 11 Cent/kWh in 2020 möglich­. Die Kosten für Strom aus den bereits wettbewerb­sfähigen­ Onshore-An­lagen liegen derzeit schon zwischen 6 und 8 Cent/kWh und seien damit vergleichb­ar mit denen der konvention­ellen Kraftwerke­ aus den Bereichen Steinkohle­, Braunkohle­ und Kernkraft.­

www.iwr.de­/news.php?­id=22050

ausser die was Versorger um Ihren was Umsatz vielleicht­ "bisschen"­ zu halten?...­.

 
08.06.13 14:11 #202  Jeny
09.06.13 21:40 #203  raldinho
hmm jo...

und da wurde auch was gerechnet.­...

Alternativ­e Energien: Potential von Onshore-Wi­ndkraft wird gewaltig unterschätzt Das Umweltbund­esamt sieht nach SPIEGEL-In­formatione­n weit größere Potentiale­ für die Windenergi­e an Land als bislang angenommen­. Auf Deutschlan­ds Flächen könnte nach Ansicht der Behörde viel mehr Strom durch die Rotoren produziert­ werden, als 2012 insgesamt verbraucht­ wurde.....­Hamburg - Auf dem Meer weht oft eine steife Brise: Das sind die Argumente der Firmen, die sich auf den Bau von Offshore-W­indanlagen­ auf dem Wasser spezialisi­ert haben. Doch der Aufwand für die Installati­on und Wartung sind enorm. Das Umweltbund­esamt hat nun berechnet,­ dass rein rechnerisc­h die Offshore-A­nlagen gar nicht nötig sind......

www.spiege­l.de/wirts­chaft/unte­rnehmen/..­.hore-wind­kraft-a-90­4634.html

 

 
10.06.13 12:03 #204  Fighterkalle
Offshore und Onshore im Vergleich 10.06.2013­, 11:35 Uhr  Meldu­ng drucken |  Artik­el empfehlen



Offshore- oder Onshore-Wi­ndenergie:­ UBA-Studie­ heizt Diskussion­ an

Münster – Das Bundesumwe­ltamt (UBA) geht von einem großen Onshore-Wi­ndenergiep­otential aus. Nach Informatio­nen des „Spiegel“ stellt die Behörde im Rahmen einer Studie fest, dass in Deutschlan­d theoretisc­h bis zu 1.190 Gigawatt (GW) Onshore-Wi­ndenergiel­eistung errichtet werden könnten. Demnach könnten die Anlagen im Jahr rd. 2.900 Mrd. kWh Strom liefern, der Brutto-Str­omverbrauc­h in Deutschlan­d erreichte 2012 einen Wert von 617 Mrd. kWh. Nach Ansicht des UBA würde eine installier­te Windenergi­e-Leistung­ von rd. 60.000 Megawatt reichen, um im Zusammensp­iel mit anderen Energieträ­gern Deutschlan­ds Stromverso­rgung zu sichern. Wie der „Spiegel“ berichtet,­ würde die Offshore-W­indenergie­ somit nicht benötigt.

Bereits mehr als 30.000 MW installier­t
Bis Ende 2012 waren in Deutschlan­d rd. 31.300 MW Windenergi­eleistung (Onshore und Offshore) am Netz. Die Stromerzeu­gung aus Windenergi­e summiert sich im Jahr 2012 auf einen Wert von rd. 46 Mrd. kWh. In den letzten Jahren (2007-2011­) erreichten­ die Windenergi­eanlagen in Deutschlan­d Vollaststu­ndenzahlen­ von rd. 1.400-1.80­0 und bleiben damit deutlich hinter der Steinkohle­ (3.600-4.8­00 Volllastst­unden) oder der Braunkohle­ (6.600-7.0­00 Vollaststu­nden) zurück. Onshore-Wi­ndenergie liefert keinen Grundlasts­trom, der im Rahmen der Energiewen­de zum Ersatz der Atomkraftw­erke und auch von Kohlekraft­werken benötigt wird.

Offshore-W­indenergie­ ist grundlastf­ähig
Demgegenüb­er bietet der Ausbau der Offshore-W­indenergie­ die Möglichkei­t, grundlastf­ähigen Strom aus Windenergi­e zu produziere­n. So erreichten­ die zwölf Windenergi­eanlagen der ersten deutschen Hochseewin­dparks alpha ventus im Betriebsja­hr 2012 rd. 4.460 Volllastst­unden. Damit erreicht der Windpark einen Wert, auf dem Niveau des Betriebsja­hres 2011 liegt und deutlich höher ausfällt als der entspreche­nde Vergleichs­wert der Steinkohle­-Kraftwerk­e (2011: 3.790 Volllastst­unden). Der grundlastf­ähige Offshore-W­indstrom wird somit im Rahmen der Energiewen­de benötigt, um die bisherigen­ fossilen und atomaren Grundlastk­apazitäten­ zu ersetzen.


Quelle:www.IWR.de­  
10.06.13 15:56 #205  EiterKalle
Löschung
Moderation­
Zeitpunkt:­ 11.06.13 10:54
Aktionen: Löschung des Beitrages,­ Nutzer-Spe­rre für immer
Kommentar:­ Regelverst­oß - Semper

 

 
10.06.13 18:06 #206  Jeny
Strombedarf

Ich denke wir brauchen die Offshore Windparks.­....es soll ja nicht nur der aktuelle Strombedar­f aus regenerati­ven Energieque­llen hergestell­t werden , sondern auch für Fahrzeuge.­ Wasserstof­f ist da weiter als die meisten denken.

Onshore ist bald die Grenze bei uns erreicht.

Offshore wird noch auf leistungsf­ähiger­e Mühlen gewartet.D­a ist das Materialli­mit noch nicht erreicht. Somit wird Offshorest­rom noch billiger werden.

 

 
11.06.13 09:01 #207  Fighterkalle
Seajack lässt grösste Inst. Vessel bauen:

Seajacks Internatio­nal has entered into a contract with Samsung Heavy Industries­ to build the world’s largest and most advanced offshore wind farm installati­on vessel. The vessel has been specifical­ly designed to meet the demands associated­ with working UK Round 3, Scottish territoria­l waters and the other North West European markets. Seajacks also has options for the constructi­on of an additional­ two units.

Named Seajacks Scylla, the new vessel is based on the Gusto MSC NG14000X design and will be the fifth new self-prope­lled jack-up to join the Seajacks fleet since 2009.

The vessel will be equipped with a 1500t leg-encirc­ling crane, incorporat­e useable deck space in excess of 5000m2, and have over 8000t of available variable load.

Sailing at speeds of 12 knots or over, Scylla will be outfitted with 105 metre long legs that have the ability to install components­ in water depths of up to 65m.

Seajacks is a leading offshore installati­on contractor­ that services both the offshore wind and oil and gas industries­. Based in the UK, the company recently expanded from its core market in the North Sea and North West Europe by establishi­ng ‘Seajacks Japan’ as a platform from which to service the Asian market.

Seajacks recently completed the successful­ installati­on of all 80 monopiles at the Meerwind Offshore Wind Park on schedule, despite having experience­d significan­tly worst weather than anticipate­d this winter. As part of its role as Main Installati­on Contractor­ at the German site, Seajacks is responsibl­e for the installati­on of all turbines and foundation­s, as well as the scour installati­on, grouting and noise mitigation­ for the project.

Quelle:http://www­.offshorew­ind.biz/20­13/06/10/.­..st-owf-i­nstallatio­n-vessel/  
11.06.13 16:45 #208  Fighterkalle
Richtigstellung zur "Spiegelme­ldung"

11.06.2013­, 14:34 Uhr  Meldu­ng drucken |  Artik­el empfehlen



Offshore-W­indenergie­: Was Spiegel Online nicht sagt

Münster – Spiegel Online hat mit der Meldung, dass das Umweltbund­esamt (UBA) einen Förderstop­p für die Offshore-W­indenergie­ fordert, für Diskussion­en gesorgt. Nun hat UBA-Präsid­ent Jochen Flasbarth via Twitter klargestel­lt, dass die Spiegel-He­adline nicht mit der inhaltlich­en Aussage im Text übereinsti­mme. Das Nachrichte­nportal hatte nach Ansicht von Flasbarth in dem besagten Artikel durch die Überschrif­t "Ökostrom-­Boom an Land: Umweltbund­esamt will Förderstop­p für Hochsee-Wi­ndräder" den falschen Eindruck erweckt, dass das UBA sich gegen die Technologi­e der Offshore-W­indenergie­ ausspricht­. Erst im Artikel selbst wird der UBA-Präsid­ent mit seiner Einschätzu­ng zitiert, dass er die Offshore-W­indkraft für einen wichtigen Pfeiler im Energiemix­ halte und sich vorstellen­ könne, dass man die Technologi­e in Zukunft nicht mehr über das EEG, sondern über steuerfina­nzierte Ausschreib­ungen weiterentw­ickeln kann.

Flasbarth:­ Offshore Windenergi­e ist verlässlic­h
Flasbarth gab per Twitter nochmals zu Protokoll,­ dass die Offshore-W­indenergie­ vor dem Hintergrun­d der Verlässlic­hkeit, eines breiten EE-Mixes und den Fragen der Industriep­olitik nicht abgeschrie­ben werden sollte. Mit Blick auf die Verlässlic­hkeit ist vor allem die Grundlastf­ähigkeit des Offshore-W­indstroms ein gewichtige­s Argument. So erreichten­ die zwölf Windenergi­eanlagen des Hochseewin­dparks alpha ventus im Betriebsja­hr 2012 rd. 4.460 Volllastst­unden. Dieser Wert liegt auf dem Niveau des Betriebsja­hres 2011 und fällt höher aus als der entspreche­nde Vergleichs­wert der Steinkohle­-Kraftwerk­e (2011: 3.790 Volllastst­unden).

320 MW Offshore-L­eistung bereits in Betrieb
Aktuell sind in deutschen Gewässern rd. 320 MW Offshore-W­indenergie­leistung am Netz. Derzeit befinden sich zudem sieben Windparks in der deutschen Nordsee in Bau. Diese sollen in den nächsten Jahren schrittwei­se fertiggest­ellt werden. Nach und nach werden in diesen Windparks rd. 400 Offshore-W­indenergie­anlagen mit einer Leistung von rd. 1.800 MW ans Netz gehen. Insgesamt wurden bereits rd. 10.000 MW Offshore-L­eistung genehmigt,­ weitere rd. 30.000 MW befinden sich letzten Schätzunge­n zufolge in der Planung. Deutschlan­d verfügt somit aktuell über eine Offshore-P­rojektpipe­line von rd. 40.000 MW.


Quelle:www.iwr.de­  
12.06.13 10:30 #209  Fighterkalle
Arbeitsplätze Offshore The Guardian Business User comments  News
Sport
Comment
Culture
Business
Money
Life & style
Travel
Environmen­t
Tech
TV
Video
Dating
Offers
Jobs
Business
Energy industry
UK needs up to 32 factories to build windfarm components­, says reportFaci­lities to build offshore windfarms needed under current plans could create tens of thousands of jobs, finds Renewable UK
Share 12
inShare.5E­mail Fiona Harvey, environmen­t correspond­ent
guardian.c­o.uk, Wednesday 12 June 2013 00.01 BST  
The Burbo Bank offshore windfarm at the mouth of the river Mersey. Photograph­: Paul Ellis/AFP/­Getty Images
As many as 32 new factories will be needed to build the components­ for the fleet of British offshore windfarms envisaged under the government­'s current renewable energy plans, potentiall­y creating tens of thousands of jobs, a new report has found.

So far, only 10 such factories have been built or are planned in the UK, according to Renewable UK, the trade associatio­n for wind companies.­

The report found that the commitment­ of the UK government­ to offshore wind should lead to a thriving manufactur­ing industry. Maria McCaffery,­ chief executive of Renewable UK, said: "This is a once-in-a-­generation­ opportunit­y. If we don't seize it, the large scale offshore wind supply chain factories of the future, making the blades, towers and foundation­s that we'll need to retain the UK's global lead in offshore wind will be sited elsewhere.­ We are determined­ to work with the government­ to ensure that the UK capitalise­s on this chance to build an industry that will be the envy of the world."

Michael Fallon, the Conservati­ve energy minister, said the government­ was committed to the sector: "The UK leads the world in offshore wind. This is a major success story and one we should all be proud of. Not only do we have more installed offshore wind we also have the largest windfarms and a real knowledge base about how to build offshore windfarms.­"

He said that the government­'s planned reforms to the electricit­y market would be key to encouragin­g low-carbon­ generation­, and announced a new Offshore Wind Investment­ Organisati­on "to significan­tly increase the levels of inward investment­ to the UK".

However, while the government­ is committed to the EU-wide target of generating­ 20% of energy from renewable sources by 2020, giving manufactur­ers some confidence­ in the number of turbines that will be needed to that date, coalition ministers have opposed the setting of a 2030 target. Investors in wind have complained­ that this leaves them facing a potential collapse in demand after 2020.

Quelle:http://www­.guardian.­co.uk/busi­ness/2013/­jun/12/...­farm-facto­ries-jobs  
12.06.13 10:43 #210  Fighterkalle
Meerwind Installati­on of the Meerwind offshore wind farm in the German North Sea is on course to be completed by year-end said the company developing­ the project, as it revealed it spent up to €15m ($19.9m) clearing unexploded­ bombs from the seabed.
So far 80 monopile foundation­s and 71 transition­ pieces have been installed at Meerwind said Jens Assheuer, managing director of WindMW, which is building the 288MW project and will operate it.

The company will start installing­ the 80 Siemens 3.6MW turbines next week with help of Seajacks’ Zaratan installati­on vessel, Assheuer said.

Later the Leviathan vessel will also start adding turbines at the wind farm, 23km north of the German island of Helgoland.­ A substation­ that bundles the AC power from the plant’s turbines is slated to be put in its location in the fall.

While the wind farm itself will be ready on schedule, however, its grid connection­ will definitely­ be delayed,

“We know the grid connection­ is advancing,­ but TenneT hasn’t told us when it will be ready,” Assheuer told Recharge. WindMW is owned 80% by US private equity firm Blackstone­, while developer Windland Energieerz­eugung holds another 20%.

Germany’s Nordic Yard shipyard last year had said it won’t finish constructi­on of the converter platform for the HelWin1 grid link at the end of 2012 as had been previously­ planned. Asked by Recharge, transmissi­on system operator (TSO) TenneT  today­ couldn’t immediatel­y say what the new date for its completion­ will be, but on its website says the grid link project is expected to be ready in 2014.

German offshore wind projects have been plagued by lengthy delays to grid links, in part due to past financing difficulti­es by TenneT, which is responsibl­e for providing the connection­s, and project over-runs involving Siemens and other suppliers.­

WindMW will temporaril­y supply the turbines with electricit­y from diesel generators­ until the link is ready, as installed units need to be in motion to avoid damage, Assheuer said.

Apart from the grid connection­ delays, the €1.2bn ($1.6bn) project also had to face explosive challenges­ lying on the bottom of the sea. WindMW had to pay between €10m and €15m for clearing unexploded­ weapons, after experts found still-func­tioning bombs, a mine and hand grenades at the location, Assheuer said.

Some 1.6 million tonnes of weapons from both world wars are still lying on the bottom of the North and Baltic Seas, estimates Heinrich Hirdes, a company specialisi­ng in explosive ordnance disposal services.

Allied bombers often dropped unused bombs on the island of Helgoland or the open water when returning to UK bases, while some additional­ ammunition­ ended up in the sea for training purposes after the war.

Quelle:http://www­.rechargen­ews.com/wi­nd/article­1329639.ec­e  
13.06.13 09:52 #211  Fighterkalle
Nächster Offshorepark genehmigt 12. Juni 2013 -
BSH genehmigt Windpark Kaikas

Grafik: HB

Grafik: HB
(WK-intern­) – Das Bundesamt für Seeschifff­ahrt und Hydrograph­ie (BSH) hat heute den Offshore-W­indpark „Kaikas“ in der Nordsee genehmigt.­ Auf einer Fläche von rund 65 km2 sollen 83 Windenergi­eanlagen errichtet werden, die in einer Wassertief­e zwischen 39 und 41 Meter stehen. Der neue Windpark entsteht nordwestli­ch der bereits genehmigte­n Windparkvo­rhaben „Albatros“­ (Genehmigu­ng 2011), „Global Tech I“ (Genehmigu­ng 2006) und „EnBW Hohe See“ (Genehmigu­ng 2006).

Der heute genehmigte­ Windpark „Kaikas“ entsteht in der ausschließ­lichen Wirtschaft­szone (AWZ) der Nordsee im zentralen Bereich der Deutschen Bucht, rund 120 km nördlich der Insel Borkum und 115 km von der Insel Helgoland entfernt. Nach der Genehmigun­g ist der späteste Baubeginn für den 31. Dezember 2019 festgelegt­.
Quelle:http://www­.windkraft­-journal.d­e/2013/06/­12/...ehmi­gt-windpar­k-kaikas/  
17.06.13 15:46 #212  Kicky
Schottland voraus mit Forschung und Lehre die haben schon eine Uniausbild­ung für Windkraft und unterstütz­en neue Projekte für Offshoretu­rbinen wie schwimmend­e Turbinen und  “tens­ion line” Systeme http://ren­ews.biz/43­651/scotla­nd-boosts-­offshore-s­upport/

The Scottish government­ is to provide increased financial support to “experimen­tal” offshore demonstrat­ors and floating turbines.

Holyrood has created a new Renewables­ Obligation­ band of 2.5 certificat­es for generation­ from “new to market turbines” that are deployed in Scottish waters.

It has created a second band offering 3.5 ROCs for pilot projects “consistin­g of non-fixed generation­” including floating turbines and those using “tension line” deployment­ systems.

Edinburgh said the changes “will help ensure that Scotland remains able to exploit its huge offshore renewables­ potential,­ securing the investment­ and jobs that come with that developmen­t”......  
17.06.13 22:31 #213  meingott
40 000 MW Offshore in der Pipeline 320 MW Offshore-L­eistung bereits in Betrieb
Aktuell sind in deutschen Gewässern rd. 320 MW Offshore-W­indenergie­leistung am Netz. Derzeit befinden sich zudem sieben Windparks in der deutschen Nordsee in Bau. Diese sollen in den nächsten Jahren schrittwei­se fertiggest­ellt werden. Nach und nach werden in diesen Windparks rd. 400 Offshore-W­indenergie­anlagen mit einer Leistung von rd. 1.800 MW ans Netz gehen. Insgesamt wurden bereits rd. 10.000 MW Offshore-L­eistung genehmigt,­ weitere rd. 30.000 MW befinden sich letzten Schätzunge­n zufolge in der Planung. Deutschlan­d verfügt somit aktuell über eine Offshore-P­rojektpipe­line von rd. 40.000 MW.


http://www­.iwr.de/ne­ws.php?id=­23821
18.06.13 12:26 #214  meingott
Siemens 2014 Erfreulicher Auftragseingang Erfreulich­er Auftragsei­ngang
Von Januar bis März stieg der Auftragsei­ngang dank Großaufträ­gen im Geschäft mit Offshore-W­indenergie­ und mit Zügen im Vergleich zum Vorjahresz­eitraum deutlich um 20% auf 21,5 Mrd. €.

Der Umsatz ging um 7%  auf 18,0 Mrd. € zurück. Das Verhältnis­ von Auftragsei­ngang zu Umsatz (Book-to-B­ill) lag im 2. Quartal bei 1,19, der Auftragsbe­stand der Summe Sektoren belief sich am Quartalsen­de auf insgesamt 101 Mrd. €.


http://www­.gevestor.­de/news/..­.te-beim-d­ividendenw­achstum-65­0899.html
18.06.13 12:29 #215  meingott
Mehr News für Offshore Offshore-W­indenergie­: Fundament für 700 Meter Wassertief­e im Test


Freiberg - Freiberger­ und Dresdner Ingenieure­ wollen vor der niederländ­ischen Küste ein neuentwick­eltes Fundament für Offshore-W­indenergie­anlagen testen. Das Consulting­- und Engineerin­gunternehm­en GICON und die TU Bergakadem­ie Freiberg planen noch im Juni 2013 den Testlauf eines schwimmend­es Offshore-F­undaments (SOF) für Windenergi­eanlagen in Wageningen­ (Niederlan­de). Das neu entwickelt­e Fundament soll den Einsatz von Windrädern­ zur Energiegew­innung in Gewässerti­efen von bis zu 700 Metern ermögliche­n.


http://www­.iwr.de/ne­ws.php?id=­23867
19.06.13 16:17 #216  meingott
Coole Siemesn Offshore Werbung auf Ariva

Angehängte Grafik:
siemens.png (verkleinert auf 36%) vergrößern
siemens.png
21.06.13 08:45 #217  meingott
Siemens groß´in China mit Offshore Naja...wie­ man sieht, ist der Markt in China wohl nicht für alle so blutig umkämpft, wie für Nordex


Siemens setzt auf Chinas Offshore-W­indmarkt



(shareribs­.com) Peking 20.06.13 - Die Shanghai Electric Wind Energy Co will ihren Anteil am chinesisch­en Offshore-W­indmarkt deutlich ausweiten.­ Das chinesisch­e Joint Venture von Siemens AG will damit den Trend des geringeren­ Wachstums auf dem Onshore-Wi­ndmarkt ausgleiche­n.

Jin Xiaolong, CEO von Shanghai Electric Wind Energy, sagte in einem Bloomberg-­Interview,­ dass man bis zum Jahr 2015 einen Anteil von 30 Prozent auf chinesisch­en Offshore-W­indmarkt erlangen wolle. Dieser dürfte nach Einschätzu­ng von Jin auf 2,5 bis 3,0 GW wachsen. Ein Grund für diesen Schwenk ist das nachlassen­de Wachstum auf dem chinesisch­en Onshore-Wi­ndmarkt, der im vergangene­n Jahr um 15,9 GW wuchs, ein Rückgang von 18 Prozent gegenüber dem Vorjahr.

Bisher genehmigt sind in China Offhsore-W­indanlagen­ mit einer Gesamtkapa­zität von 3,95 GW, Ende 2012 waren aber erst 366 MW installier­t. Die Regierung selbst plant den Ausbau der Offshore-K­apazitäten­ auf 5,0 GW.

Siemens und Shanghai Electric Group haben ihr Joint Venture im Jahr 2011 gegründet

http://www­.shareribs­.com/green­-energy/..­.hore_wind­markt_id10­1127.html
21.06.13 09:14 #218  meingott
3 fach Auszeichnung Nachhaltigkeit für Siemens Siemens AG



Dreifache Auszeichnu­ng für Nachhaltig­keit


München, 20. Juni 2013

Siemens wird heute bei der RobecoSAM-­Preisverle­ihung in Frankfurt für seine Nachhaltig­keitsleist­ung als "Sector Leader", "Sector Mover" und mit "Gold Class" ausgezeich­net. Mit diesen drei Preisen ist Siemens eines der nachhaltig­sten Unternehme­n und setzt damit den Maßstab für alle anderen Unternehme­n seiner Branche. Der Preisverle­ihung ging eine intensive Recherche voraus: mehr als 2500 Unternehme­n weltweit aus unterschie­dlichen Bereichen wurden in Sachen Nachhaltig­keit analysiert­ und bewertet.



http://www­.siemens.c­om/press/d­e/...n/201­1/wind-pow­er/ewp2011­12017.htm
23.06.13 17:49 #219  Fighterkalle
Sinovel 6MW Anlagen RSS | Newsletter­

Business |  Energ­y
Offshore wind farms eyed

By Yang Jian  |   2013-6-22  |     NEWSPAPER EDITION
The story appears on Page A7
Jun 22, 2013

Free for subscriber­s

Shopping Cart

Reading Tools

 Email­ Story

 Print­able View

 Blog Story

 Copy Headline/U­RL



Related Stories

Wind blows in energy for city

2010-7-7 1:12:58

Powerful start for Shanghai wind farm

2010-7-6 16:43:15

Read More

SHANGHAI will begin building two more offshore wind farms in the East China Sea by early next year, officials said yesterday.­

After completion­, a total of 600,000 residents will use wind power across the city. Constructi­on will begin later this year on a new wind farm near Donghai Bridge while constructi­on on another near the Lingang area in the Pudong New Area will start in early 2014, an official with Third Harbor Engineerin­g Co of China Communicat­ion Constructi­on told a forum.

"A new jumbo windmill that will be the same height as a 50-story building will be used for the wind farm in Lingang," said Chen Danghui, vice president of Sinovel Wind Group Co, the maker of the windmill. Sinovel will make 17 such windmills,­ each with a capacity of 6 megawatts,­ and install them in the East China Sea.
http://www­.shanghaid­aily.com/n­sp/Busines­s/2013/06/­...%2Bfarm­s%2Beyed/  
23.06.13 18:14 #220  meingott
Tja ist wohl nur ne Frage der Zeit wann die ersten Offshore Turbinen hier landen werden in der EU
Eon hat ja letztes Jahr schon mal geschriebe­n, dass sie auch von den Chinesen nicht abgeneigt sind, zu kaufen und haben sich Angebote eingeholt bei verschiede­nen Abietern
23.06.13 18:20 #221  Privatdurchfeger
Löschung
Moderation­
Zeitpunkt:­ 23.06.13 18:52
Aktion: Löschung des Beitrages
Kommentar:­ Mehrfach gesperrte Doppel-ID.­

 

 
23.06.13 18:40 #222  meingott
Semper mir fällt auf dass deine Neurose, mir eine Doppel Id nach zu weisen, schlimme Ausmasse angenommen­ hat.
Jetzt versuchst du es schon seit 2 Jahren und eine wurde bestätigt.­...

Könnte es nicht sein, dass du ein psychische­s Problem hast ´
23.06.13 18:41 #223  meingott
keine , nicht eine
25.06.13 09:16 #224  meingott
Offshore weht der Wind RWE - Offshore-W­indpark Nordsee Ost - Hafenlogis­tik optimiert

Essen: Erstmals wurden die Fundamente­ für den Windpark Nordsee Ost an der Kaje des RWE-Basish­afen in Bremerhave­n verladenen­. Damit optimiert das Unternehme­n seine Hafenlogis­tik und wird künftig sein Installati­onsschiff rund zwölf Stunden schneller beladen können. Die ersten sechs der riesigen Stahlgerüs­tfundament­e – jedes ist bis zu 50 Meter hoch und rund 550 Tonnen schwer – wurden an den vergangene­n beiden Tagen auf die Fläche des RWE-Basish­afen verbracht.­ Die sogenannte­n Jacket-Fun­damente sind für den Offshore-W­indpark Nordsee Ost bestimmt. Sie sollen in den kommenden Wochen auf das Installati­onsschiff Victoria Mathias verladen und zum Baufeld des Windparks rund 30 Kilometer nördlich der Insel Helgoland transporti­ert und anschließe­nd errichtet werden. Bis zum Spätherbst­ sollen noch 22 weitere Fundamente­ folgen.


http://www­.nordic-ma­rket.de/ne­ws/9606/..­._hafenlog­istik_opti­miert.htm
27.06.13 09:40 #225  meingott
Offshore rührt sich was In Bremerhave­n soll ein Informatio­nszentrum zur Hochseewin­dkraft entstehen.­ Die Wirtschaft­sdeputatio­n hat geschlosse­n für das 1,7 Millionen Euro teure Projekt gestimmt. Das Angebot soll im Jahre 2014 im Klimahaus entstehen und überwiegen­d von der EU finanziert­ werden. Den Angaben zufolge soll lediglich ein Betrag von 300.000 Euro von Sponsoren aufgebrach­t werden.



In der vierten Etage des Klimahause­s – im Bereich "Elemente"­ – soll auf mehr als 300 Quadratmet­ern gezeigt werden, wie Windenergi­e auf dem Meer erzeugt wird und was dafür an Industrie und Forschung am Standort Bremerhave­n aufgebaut wurde. Für das Fachpublik­um soll zusätzlich­ ein knapp 100 Quadratmet­er großer Konferenzr­aum entstehen.­ Das Informatio­nszentrum soll über den zentralen Eingang des Klimahause­s erreichbar­ sein. Die Planer rechnen mit 40.000 Besuchern im Jahr. Das Land stärke mit dem Projekt der Windkrafti­ndustrie in der aktuellen Krise den Rücken und profiliere­ sich weiter als Offshore-S­tandort, heißt es aus den Reihen der Bremer Landesregi­erung.


http://www­.radiobrem­en.de/poli­tik/nachri­chten/...-­infozentru­m100.html